CIBSE Climate Adaptation and Resilience Conference recap
October 22nd 2026

CIBSE Climate Adaptation and Resilience Conference recap

The CIBSE Climate Adaptation and Resilience Conference on 21 October put overheating, flooding and the performance gap at the centre of the agenda. Here’s what it signals for how we model, design and operate buildings.
 
Two days on from the conference, one message stands out from the programme: adaptation is no longer a future consideration to be added to net zero planning. It’s now a core design and compliance question. Held in London, the day was built around practical implementation, cross-industry collaboration and the policy and market drivers pushing resilience up the agenda.

What the day set out to cover

The programme ran across four sessions. The first looked at strategic direction and industry adoption, with speakers from CIBSE, UKGBC and the City of London. The second, chaired by Arup, mapped climate risk and sector readiness across overheating, flooding, moisture and water resilience. The third was hosted by CIBSE’s Resilient Cities Group and focused on the tools, frameworks and methodologies behind resilience planning. The final session turned to case studies across new-build, retrofit and heritage projects, with contributions from Ramboll and Max Fordham.

Five themes worth noting

The conference organised its content around five themes, and each one points to a practical shift for engineers.

1. Policy and compliance: planning policy, resilience standards and emerging insurance requirements are putting more weight on overheating mitigation and flood preparedness, with engineers needing clear guidance on applying CIBSE TM59, TM61 to TM64 and the Climate Action Plan.
2. Rising climate risks: extreme heat, intense rainfall and drought are driving demand for robust strategies, with HVAC and power system failures now treated as urgent risks.
3. Skills, tools and innovation: upskilling in climate modelling and resilience assessment is needed across the sector.
4. The performance gap in climate resilience: buildings remain vulnerable to overheating and moisture risk despite design-stage modelling.
5. Retrofit and existing stock: most of the buildings that will exist in 2050 are already operational.

asset_image
Learnings to take forward


Model the climate a building will actually experience. The organisers called for improved use of future weather files, climate scenarios and resilience metrics. CIBSE’s Design Summer Years already cover 2020s, 2050s and 2080s timelines, and its 2026 Climate Action Plan update includes further work on future weather files. Compliance-year weather alone is no longer enough for a building with a 40- or 50-year life.

Treat the performance gap as a resilience issue, not just an energy one. The gap between predicted and real-world performance has been discussed for years in energy terms. The conference framing extends it to overheating, moisture and service disruption. Closing it means validating models against measured data and keeping that evidence alive through operation, rather than treating handover as the end of the analysis.

Prioritise the existing stock.
New buildings are the smaller part of the challenge. Retrofit guidance such as TM61 to TM64, alongside PAS 2035, will matter more as owners work out which assets are most exposed and what to do first. That is a prioritisation problem, and prioritisation needs quantified risk rather than instinct.

Standardise the method, then collaborate on the answer. Consistent standards give design teams, planners and insurers a shared language. TM59, introduced in 2022 as a route to demonstrating compliance with Approved Document O, shows the value of a standard method for overheating assessment. The cross-sector speaker line-up, spanning engineers, architects, academics and local government, reinforced that resilience cannot be solved by one discipline.

What this means for modelling teams

Dynamic simulation sits at the centre of most of these themes. Hourly modelling with future weather data lets teams test overheating risk under projected conditions, compare adaptation measures before committing capital, and evidence decisions to planners and clients. IESVE 2026 includes the new CIBSE TM59:2026 overheating assessment, a guided, stage-by-stage workflow with premade templates that produces a client-ready report, available as a download from the IES Content Store. IES Consultancy can also support climate risk assessment for new and existing buildings.

The direction of travel is clear. Resilience is moving from aspiration to requirement, and the teams that are best placed to respond will be those with the evidence to show how their buildings perform now and in the climate to come.

Want to understand how your portfolio performs under future climate scenarios? Get in touch with our expert team.