Our patented VE-Navigator technology provides you with a robust and detailed step-by-step structured workflow for Part L2 compliance and EPC generation for 2013 (England), 2014 (Wales) and 2010 (England/Wales).
- England & Wales Compliance.
- Part L2 2013 (England), 2014 (Wales) and 2010 (England/Wales) compliance checks.
- 2013 (England), 2014 (Wales) and 2010 (England/Wales) EPC generation.
- Both SBEM and/or DSM methodology.
- Revolutionary easy to use step-by-step guidance from model setup, to data assignment, to simulation.
- Concise reporting with interactive filters for easy interrogation.
- Unique built-in QA functionality – design team collaboration and tracking.
- Improved modelling efficiency and accuracy.
- Significant time saving leading to rapid iteration.
This innovative tool streamlines the process and ensures no step is missed.The navigators provide:
- Step-by-step guidance and instruction across compliance rules and process
- Confidence that each key stage has been addressed
- Unique reports which compare Notional and Actual models (DSM)
- Identifies key areas where design ratings can be improved (DSM)
- Unique built in QA functionality
- Design team collaboration: add and share notes
- Track team progress: date/user stamp check box
- Integrated guidance notes
- Analysis Automation
For both Part L2A 2013 & 2010 DSM the Navigator analyses the results of the regulations calculation and provides guidance to help streamline the design process to produce a minimally compliant building by providing two main outputs:
- ‘Key model inputs comparison’
- Quick check assessment for use at early project stages
- Demonstrates whether you stand a good chance of passing or not
- Clearly shows what level of efficiencies the project is likely to achieve
- ‘Identify dominant issues for improvement’
- Quickly achieve the efficiencies required for compliance
- Tailored guidance on where to focus your efforts based on your design
- Identifies which strategies will be the most effective in reducing dominant loads
Dependant on the route to compliance and whether the project is a level 3, 4 or 5 building the Navigators produce specific tailored reportage:
- Part L2A 2013 & 2010 SBEM
- SBEM calculations summary
- SBEM calculation details
- BRUKL document
- EPC
- Part L2A 2013 & 2010 DSM
- Pass Results (BER/TER)
- Carbon dioxide emissions summary
- Energy summary
- Actual Building – carbon & energy breakdown (heat, cool, AUX, lights, DHW)
- Actual System – carbon & energy breakdown
- Notional System – carbon & energy breakdown
- Notional Building – carbon & energy breakdown
- Criterion 3 solar gain check
- BRUKL document
- EPC